Site investigation ahead of new housing
Malmö, 2020–2023
Site investigation ahead of new housing
Malmö, 2020–2023Site investigation in several rounds ahead of new housing. The area was once home to an industry that manufactured chlorinated hydrocarbons. The buildings were demolished many years ago, after which the site lay empty for a long time. The ground has been partly remediated.
Land & water
Site investigation and material survey of old industrial premises
Malmö, 2023–2025
Site investigation and material survey of old industrial premises
Malmö, 2023–2025An old industrial area is being converted into offices in the existing premises and new housing. We investigated the ground at 30 points, including soil gas, to clarify the risks from contamination beneath the buildings that are to be kept. In the buildings we carried out material surveys and air sampling to establish whether there are any risks to people using the premises.
Land & water
Site investigation of a large development area
Kävlinge, 2024
Site investigation of a large development area
Kävlinge, 2024We investigated the area in 188 grid squares and analysed a total of 304 samples to classify the topsoil on the farmland, the natural soil beneath it and all fill in the area. The site was previously farmland and had buildings that were demolished long ago.
Land & water
Pre-classification of soil ahead of new housing
Lund, 2023
Pre-classification of soil ahead of new housing
Lund, 2023On a site with fairly deep old fill, we pre-classified the soil ahead of remediation and construction of housing. We sampled five points per 20 × 20 m grid square and analysed the samples in 0.5 m intervals. Thanks to the pre-classification, no environmental supervision was needed during the remediation.