Projects

A selection of assignments in contaminated land, water and buildings.

Buildings & reuse

Reuse inventory of an old industrial building

Lund, 2023–2024

Building material and reuse inventory ahead of the demolition of an old, contaminated industrial building. Large concrete structures from the industrial halls are to be reused in new concrete structures on the same property.

Buildings & reuse

Reuse inventory of a school

Hjärnarp, Ängelholm, 2024

Building material and reuse inventory of a school that is to be demolished and reused in a new school building on the same property.

Buildings & reuse

Environmental supervision as an industrial building becomes a school

Malmö, 2024–2025

The building has housed several earlier businesses. During its conversion into a school, hazardous building materials such as asbestos and tar adhesive were found, and PAH and petroleum hydrocarbons were detected beneath the floors. We carried out ongoing environmental supervision throughout the conversion.

Land & water

Site investigation ahead of new housing

Malmö, 2020–2023

Site investigation in several rounds ahead of new housing. The area was once home to an industry that manufactured chlorinated hydrocarbons. The buildings were demolished many years ago, after which the site lay empty for a long time. The ground has been partly remediated.

Land & water

Site investigation and material survey of old industrial premises

Malmö, 2023–2025

An old industrial area is being converted into offices in the existing premises and new housing. We investigated the ground at 30 points, including soil gas, to clarify the risks from contamination beneath the buildings that are to be kept. In the buildings we carried out material surveys and air sampling to establish whether there are any risks to people using the premises.

Land & water

Site investigation of a large development area

Kävlinge, 2024

We investigated the area in 188 grid squares and analysed a total of 304 samples to classify the topsoil on the farmland, the natural soil beneath it and all fill in the area. The site was previously farmland and had buildings that were demolished long ago.

Land & water

Pre-classification of soil ahead of new housing

Lund, 2023

On a site with fairly deep old fill, we pre-classified the soil ahead of remediation and construction of housing. We sampled five points per 20 × 20 m grid square and analysed the samples in 0.5 m intervals. Thanks to the pre-classification, no environmental supervision was needed during the remediation.

Buildings & reuse

Material survey of Magasin M1 in Malmö harbour

Malmö, 2022–2023

One of Malmö harbour's oldest warehouses, built in the 1920s, with 4,400 m² over three floors and a basement. The building was used for storage and has stood empty in recent years. It is now being fully renovated so that new businesses can move in.